Phase 3: Joists

Install 2x8 PT joists across the 3 beams at 12" OC MODIFIED (plan called for 16" OC). Attach with Simpson H2.5AZ hurricane ties. Apply Trex Protect joist tape after installation.

Joist Layout

Pool (curved rim joist attaches to joist ends here) Beam 1 Beam 2 Beam 3 Joist 1 (rim) ...15-16 joists... Joist 16 (rim) Each joist = 14'-0" long 14'-8" depth ยท joists at 12" OC
Top-down. Joists (brown) run PARALLEL to pool, resting on top of 3 beams (red/perpendicular). ~15-16 joists at 12" OC across the depth. Outer joists become the LEFT and RIGHT rim joists.
Original plan calls for 11 joists at 16" OC. We're using 12" OC for firmer Trex Transcend Lineage composite feel. That's why the invoice shows 16 joists (11 from Order 1 + 5 from Order 2) โ€” matches the tighter spacing.

Hardware for This Phase

ItemQuantitySource
2x8 PT SYP at 14'16 pieces total (11 from Order #1 + 5 from Order #2)On hand
Simpson H2.5AZ hurricane tiesNeed ~45-48 (3 per joist ร— ~15-16 joists). 50 on hand โ€” tight buffer of 2-5, so don't waste any.On hand
Simpson SD9 x 1-1/2" Strong-Drive Connector Screws (SD9112)~480 (10 per tie ร— 48 ties). 500-count box = ~20 buffer.NEED TO BUY
Trex Protect Joist Tape 1-5/8" x 50'Use most of 5 boxesOn hand
Trex Protect Joist Tape 3-1/8" x 50'Use 1 box for beam topsOn hand
Screw type matters: H2.5AZ hurricane ties are designed for 8d common nails (0.131" ร— 2-1/2") OR Simpson SD9 ร— 1-1/2" Strong-Drive Connector screws (part SD9112). Do NOT use SD10 (those are for post bases like ABA66Z) or generic wood screws โ€” Simpson only warranties SD screws as nail replacements in these connectors.

Tools

Part A: Layout Joist Positions on Beams

Do the layout BEFORE applying joist tape. Once the tape is on the beam tops, chalk marks won't hold well. Mark joist positions on the SIDES of the beams (a small vertical tick mark on the beam face) so the marks stay visible after taping.

Step 1: Mark First Joist Position

1Mark the first joist position at the back edge of the deck.

Step 2: Mark Remaining Joist Positions at 12" OC

2Mark tick marks along each beam at 12" intervals.

Tick marks must line up across all 3 beams. If layout is off on one beam, joists will sit crooked. Verify by measuring from a common reference (like the back edge of the deck) to each tick mark on each beam.

Step 3: Cut Joists to Length

3Cut each 2x8 joist to length.

Part B: Apply Joist Tape to Beam Tops

Why joist tape: Trex Protect tape prevents water from sitting on top of the joist/beam, which causes rot. Especially important on a pool deck with constant water exposure. Apply BEFORE setting joists so the joist bottom sits on top of the tape.

Step 4: Apply 3-1/8" Tape to Beam Tops

4Apply Trex Protect 3-1/8" tape to the top of each beam.

Part C: Install Joists

Step 5: Check Each Joist for Crown

5Sight along each joist to find the crown.

Step 6: Set Each Joist on the Beams

6Place each joist on the beams at its tick mark, crown up.

Step 7: Install Hurricane Ties at Each Beam Intersection

End view โ€” joist on beam with H2.5AZ hurricane tie Beam (2-ply 2x8) 3" wide ร— 7-1/4" tall Joist 2x8 1-1/2" ร— 7-1/4" 5 holes into joist SD9 ร— 1-1/2" through joist-side flange 5 holes into beam SD9 ร— 1-1/2" through beam-side flange H2.5AZ hurricane tie (Z-MAX galvanized) Wraps joist to beam on ONE side of joist 10 SD9 screws total (FILL EVERY HOLE) Each joist gets 3 ties total โ€” one at each of the 3 beam crossings Alternate the tie side per joist so screws don't crowd one face of the beam
End view showing the joist sitting on top of the beam with an H2.5AZ tie wrapping from joist side to beam side. 5 screws per flange ร— 2 flanges = 10 SD9 ร— 1-1/2" screws per tie. Every hole gets a screw.

7Install a Simpson H2.5AZ hurricane tie at each point where the joist crosses a beam.

Fill EVERY hole in each hurricane tie. Per Simpson's data sheet, skipping holes reduces the tie's rated uplift capacity below its 415 lb rating. Simpson only guarantees the load rating when all fasteners are installed.

Step 8: Repeat for All Joists

8Install all ~15-16 joists at 12" OC across the deck.

Part D: Apply Joist Tape to Joist Tops

Step 9: Apply 1-5/8" Tape to Joist Tops

9Apply Trex Protect 1-5/8" tape to the top edge of each joist.

Apply tape AFTER all joists are in position and hurricane ties are installed. The tape then covers screw heads and hurricane tie tops, sealing them from water intrusion.

Part E: Verify Joist Tops

Step 10: Check Joist Tops for Coplanarity

10Set laser at joist-top elevation and verify all joist tops are at the same level.

Part F: Mid-Span Blocking (Recommended)

Step 11: Optional Blocking Between Beams

11Add 2x8 blocking between joists at the midpoint of each beam span.

Completion Checklist

Common Problems & Fixes

Joist won't sit flat on all 3 beams

One beam is high or low. Address the beam issue first (shim or trim), then install joist.

Joist looks bowed after installation

Normal if crown is UP. Deck load will flatten it over months. If severe, replace that joist.

H2.5AZ tie flanges don't wrap around 2-ply beam

H2.5AZ is designed for 2-ply beams (up to 3" wide). Verify orientation โ€” flanges should wrap around the top corner of the beam and the side of the joist. If flanges are too short, verify you have H2.5AZ (not H1 which is for single 2x).

Joist tape won't stick

Surface may be wet or dirty. Wipe clean with dry rag. If PT lumber is still wet from treatment, let it dry a few days before taping. Warmer temperatures help adhesion.

Joist tape tears while installing

Peel backing more gradually. Press tape into place as you go rather than trying to align a long piece at once.

Missed a joist position โ€” spacing is off

Remove the misplaced joist, reset at correct 12" OC location, reinstall hurricane ties. Better to fix now than after Trex is on.