Phase 2: Beams

Build three 2-ply 2x8 PT beams. Install in notched post tops. Bolt with (2) 1/2" x 6-1/2" bolts per post connection (plan says 6" minimum — buy 6-1/2", see hardware note below).

Beam Layout

Three beams run PERPENDICULAR to the pool, through each column of 3 posts:

Each beam sits in NOTCHES on 3 posts and cantilevers 2'-0" past the outer posts on both ends. Total beam length ≈ 14'-8". See Phase 1 post grid diagram for the top-down layout.

Wait for cure: Do not install beams until concrete has cured at least 7 days.

Hardware for This Phase

ItemQuantitySource
2x8 PT SYP at 14'2 piecesOn hand (Bushka: BEAMS)
2x8 PT SYP at 16'4 piecesOn hand (Bushka: BEAMS)
#10 wood screws, 2-1/2" long (exterior grade)~100 (1 lb box)NEED TO BUY
1/2" x 6-1/2" hex bolts (hot-dip galv)18NEED TO BUY — plan says 6" MINIMUM, but the bolt passes through 5-1/2" of wood; a 6" bolt leaves barely enough thread for washer + nut. 6-1/2" is the right buy.
1/2" flat washers (hot-dip galv)36NEED TO BUY (2 per bolt)
1/2" hex nuts (hot-dip galv)18NEED TO BUY

Tools

Part A: Build the Beams (Ground Work)

Step 1: Cut Beam Members to Length

1Cut 2 pieces of 2x8 PT for each of the 3 beams (6 pieces total).

Which beam gets the shorter 14' pieces? Use them for the MIDDLE column beam. That beam's ends are cantilevered but not near the deck corners, so slightly reduced cantilever is structurally fine. The OUTER two column beams (from 16' pieces) get the full 14'-8" length with full 2' cantilevers.

Step 2: Check for Crown

2Sight along each 2x8 to find its natural crown (bow).

Step 3: Laminate the 2 Plies

Per A3.1 detail 02: "#10 WOOD SCREWS MIN. 2-1/2" LONG, STAGGERED IN 2 ROWS. 16" TYPICAL. 2 THREADED SCREWS AT EACH END."

3Screw the two 2x8s together face-to-face.

Beam side view — #10 screw stagger pattern Row 1 Row 2 2" 2" 16" 16" 8" stagger = end screws (2 per end, closer than 16") = #10 x 2-1/2" wood screws
Beam laminated face-to-face. Row 1 at 2" from top, Row 2 at 2" from bottom. Screws every 16" per row, offset 8" so alternates every 8" along the beam. Extra pair at each end.
Count: ~11 screws per row × 2 rows = ~22 screws per beam + 4 end screws = ~26 per beam. Times 3 beams = ~78 screws total.

Part B: Install Beams on Posts

Step 4: Lift Beam Onto Posts

4Lift each 2-ply beam onto the 3 notched posts of its column.

Cantilever check: Measure from the outer post face to the end of the beam on both sides — should be 2'-0" (24") equal on each end. Slide the beam if needed before securing.

Step 5: Verify Beam Level

5Use laser or level to verify beam top is level along its length.

Step 6: Drill and Bolt Beam to Each Post

Per A3.1 detail 01: "(2) 1/2" DIAMETER x 6" LONG (MIN.) BOLTS WITH WASHERS"

Top-down view (looking down at post top) Beam (3" wide, 2-ply) Post material 2-1/2" 3" (beam) 2-1/2" 5-1/2" (6x6 face) Top bolt Bottom bolt Side view (looking at post face) Beam in notch 7-1/4" (2x8 depth) 2" from top 2" from bot. ~3-1/4" apart (2) 1/2" × 6-1/2" HDG bolts with washers Bolts pass through: 2-1/2" post material + 3" beam = 5-1/2" total. 6-1/2" bolt gives 1" for washer + nut.
Left: top-down showing beam in the notch, bolts go through the back 2-1/2" of post + through the beam. Right: side view showing bolt positions — 2" from top and 2" from bottom of the beam.
Understanding the geometry: Because you notched the posts, the beam sits INSIDE a cutout in the top of each post. Looking down from above, the notch removed 3" of the post (making room for the beam), and 2-1/2" of post material remains behind the beam. The bolts pass through the remaining 2-1/2" of post material AND through the 3" thick beam — a total of 5-1/2" of material. That's why the buy list specifies 6-1/2" bolts: a 6" bolt (the plan's stated minimum) leaves only ~1/2" for the washer and nut, which is marginal; 6-1/2" gives a full inch of thread on the far side.

6At each post, drill and install 2 through-bolts.

Drill BOTH bolt holes at one post before inserting either bolt, then install both bolts together. This keeps the beam from shifting between drill operations.
Bit length: You need a 1/2" drill bit at least 9" long (or a 12" ship auger bit) to reach all the way through the post + beam and still have shank in the drill chuck. Standard 6" bits are too short.

Step 7: Repeat for All 3 Beams

7Install left, middle, and right column beams the same way.

Each beam gets 6 bolts total (2 per post × 3 posts). Total for all 3 beams: 18 bolts.

Part C: Verify Alignment

Step 8: Check Beams Parallel

8Measure between adjacent beams at multiple points.

Step 9: Verify Beam Tops at Same Elevation

9Use laser to verify all 3 beam tops are at the same level.

Any variance greater than 1/8" between beams means joists won't sit flat. Address by shimming beams or trimming posts before proceeding.

Completion Checklist

Common Problems & Fixes

Beam doesn't sit level across 3 posts

Verify each post is the same height. If one post is 1/4" too tall, trim with Sawzall. If too short, shim with hardwood shim in the notch.

Cantilever isn't 2'-0" equal on both ends

Slide beam left or right in the notches to center it before bolting. If beam is too short overall, cantilever less on each end. If too long, trim off excess.

Beam won't drop into notch

Notch may be too shallow or narrow. Re-check dimensions (7-1/4" deep × 3" wide). Enlarge with chisel or Sawzall.

1/2" bolt is tight in hole

Use 9/16" drill bit instead of 1/2" for easier bolt insertion. Still holds securely.